S19 Nisko Południe – Podgórze

As part of the investment, a 2×2 lane expressway S19 was constructed, spanning 11.5 km in length, forming a segment of the Via Carpatia transport route. In addition to the main carriageway, the following were also built: 9 bridge structures, 9 culverts, 2 rest areas (MOPs) at Jeżowe and Podgórze, crossroads, access roads, technological lanes, retention reservoirs, road safety and environmental protection devices. Over 1.5 km of the national road DK19 and technical infrastructure were reconstructed. The S19 expressway was opened for use on December 6, 2021.
MGGP S.A.'s scope of work during the construction included comprehensive geodetic services, such as: establishing and measuring the control network, geodetic positioning of building structures and accompanying infrastructure, staking out and as-built inventory of underground utility networks, ongoing geodetic support for construction activities, preparation of as-built inventories for disappearing works, stabilization of boundary points and witnesses along the road corridor, and preparation of a final inventory of the completed investment.

View others

glowne
zdj_28
en_USEnglish