The scope of work carried out by MGGP S.A. included comprehensive geodetic support for all construction works under the contract, as well as preparation of as-built documentation, particularly in relation to construction site management.
– The A4 motorway spans 4.01 kilometers in length.
– 8 engineering structures (bridges, viaducts, wildlife crossings),
– at the "Rzeszów Zachód" interchange,
– Highway Maintenance Area
– access roads and internal roads
– reconstruction and construction of technical infrastructure facilities
– road traffic safety devices.
The A4 motorway is part of the international E-40 route, located within the III European transport corridor. Between the Rzeszów Zachód Interchange and the Rzeszów Centrum Interchange, the construction contractor built the road structure and constructed a two-level grade-separated interchange with the S19 road, as well as intersections with crossroads.